JR East to Perform Track Switching Work at Oimachi Station on November 17th, Suspending Service between Kamata and Shinagawa Stations until Approximately 4:30 PM
Tokaido Shinkansen: Planned Suspension Continues on September 1st Due to Heavy Rains Between Mishima and Nagoya Station
JR Central has announced that the Tokaido Shinkansen will continue to have planned suspensions on September 1st due to the effects of Typhoon #10.
The section between Mishima and Nagoya Station will be suspended for the entire day due to the heavy rains in Shizuoka Prefecture.
Between Tokyo and Mishima Station, and between Nagoya and Shin-Osaka Station, temporary “Kodama” services with all unreserved seating will operate approximately two trains per hour in each direction.
From September 1st to 2nd, there is a possibility that entire lines or sections may undergo planned suspensions or extended operational pauses.
The translation may not be accurate.