
52-Hour Limit, 4,600 Personnel Effort: Details of the Shibuya Station Construction Halting Half of the Yamanote Line
JR East will open Kamitokoro Station on March 15, 2025.
The station will be located between Niigata and Hakusan stations on the Echigo Line, 1.5 kilometers from Niigata Station. It will have a two-platform, two-track configuration suitable for six-car trains. All local trains on the line will stop at this station.