
52-Hour Limit, 4,600 Personnel Effort: Details of the Shibuya Station Construction Halting Half of the Yamanote Line
Tsugaru Railway implemented a timetable revision on June 1.
This adjustment is due to the retirement of train operators (engine drivers). The company aims to maintain a safe operation system by transitioning from the previous three-operator system per day to a two-operator system. After the revision, the number of trains will be 11 for the upward direction towards Tsugaru Goshogawara (previously 13) and 10 for the downward direction towards Tsugaru Nakazato (previously 13).